The UHMW wear plate has gradually been widely used, and its ultra-high performance has been widely recognized by the users. However, we must perform the correct operation according to the instructions during the installation. Only in this way can the installation of the plate be completed smoothly. For details on this, let us explain in detail:
- Considering the angle of the loose material and the friction coefficient between the material and the lining, it is recommended that the angle between the material surface of the silo and the horizontal direction is a>68°, so that the material can be integrated in the entire warehouse after the polymer lining is installed. Avoid or reduce the detention zone without using an oscillator and air cannon.
- Before installing the UHMW wear resistant plate, the installation process should be based on the actual condition of the silo, and it should be implemented during installation.
- Check the condition of the silo before the installation of the board. If there is a bump or a recess, it should be treated as flat as possible. The used cement silo should be thoroughly cleaned beforehand to prevent the liner from being installed tightly. Or the off-board situation occurs.
- When installing UHMWPE wear plates, the joints perpendicular to the material flow direction should be minimized to reduce the flow resistance of the materials and achieve the best logistics effect.
The installation steps of polymer wear plates are mainly these. Everyone must follow the instructions for correct operation. If you still don’t understand what you are doing, please feel free to contact